BioEnergy Working Group 3 Consultation
DCENR set up four working groups in 2014 to allow consultation on the National Bioenergy Plan.
Working Group 3 (Biomass Supply Chains) met in December (2015) and reviewed the following proposed changes to the BioEnergy Plan
We are now asked to comment on these proposed changes, by the end of this week. The changes are only 3 pages so its quite fast to do.
We are asking members to have a look at the proposed changes and send your comments / suggestions to myself by close of business Thursday. I will compile IrBEA’s response and send in by Friday this week.
Some of the main changes we are considering are:
7.1 Propose changes to legislation to allow sludge to be spread on energy crops. This is currently only allowed with a waste permit, where as sludge can be spread without a waste permit on food crops!
7.3 We received a proposal to make B-Train trucks legal. B-Trains are essentially twin trailers, and will lower the transport costs of light bulky materials like wood chip.
9 Retain the sentence “Additional funding will be required in the period to 2020 to fund the establishment of the bioenergy sector”
9.2 Is there a need to legislate or regulate for district heating? we would be interested in members views. Also we will be calling for all public buildings to be required to embrace district heating where it is available and economic
We welcome your comments on the above.
With Best Regards,
Noel Gavigan